+86-515-88811626
Home / Knowledge / Details

Nov 26, 2021

The preparation work to be done before the generator starts to run

1. Do a detailed inspection of the lubricating oil. Especially the oil level, fuel quantity, etc., must be checked before starting. Only if sufficient oil is ensured, the generator can be more efficient and faster in the process of running and generating electricity, and there will be no shortage of oil.

2. A comprehensive inspection should be formed on the pipelines of some systems of the generator to ensure that there will be no oil or water leakage, so that it can be operated. Once the management encounters oil and water leakage, there may be a fault problem, which needs to be solved in time, otherwise it will have a great impact on the power generation, and even burn out the equipment. Therefore, the oil and water leakage before starting the operation must be carefully checked to ensure that there is no problem before the operation can be carried out.

3. The connection of the electrical circuit is also a prerequisite to ensure the normal operation of the generator. At this time, it is necessary to ensure that there is no hidden danger of leakage on the line, and the loose or firm conditions must be reasonably checked, so that it will be safer and more reliable during operation. In short, if you grasp the main points of the preparation work in this regard, you will find that the operating efficiency will continue to improve. Therefore, it is necessary to understand the connection of the line clearly during the inspection process.


Send Message