+86-515-88811626
Home / News / Content

Aug 17, 2026

SGS Testing Process For SLONG Gas Generator

Dora nie
Dora nie
Sales of Yancheng Slong Machinery

SGS testing for Slong NG LPG gasolinr generator 

 

 

Date :July 22rd,2026

ADD:6 Youyi Road, Changzhou Hi-Tech IndustrialL Park, Dafeng, Yancheng, Jiangsu, China

(YANCHENG SLONG MACHINERY & ELECTRIC CO.LTD.)

 

The purpose of this inspection procedure is to verify the manufacturing quality, operational performance, safety, and compliance of the portable generator with the required technical specifications before final shipment from the factory.

All inspection and test results shall be recorded and approved by the manufacturer's Quality Control (QC) department and/or the buyer's technical representative.

 

1. Load Performance Test

loading test for slong generator

2.Endurance Test

Endurance Test

3.Raw material checking

Raw material checking

Yancheng SLONG Machinery & Electric Co., Ltd., founded in 2007, is a professional manufacturer specializing in generator manufacturing and power solutions, including home standby generators, commercial standby generators, LPG generators, natural gas generators, gasoline generators, welding generators, high lift pumps, sand suction pumps and sewage pumps.

With With nearly 20 years of manufacturing experience, SLONG focuses on providing reliable power and equipment solutions for residential, commercial and industrial applications worldwide.

 

E-mail: slong8@slongco.com

Mobile/ Wechat/ Whatsapp:+8613912507972

-NEW2026

Send Message